A kitchen remodel is one of the faster major projects in a home, though the exact timeline depends on how extensive the work is. On-site construction for a kitchen typically runs in the range of a few weeks, with more focused updates on the shorter end and full redesigns that change the layout on the longer end. As a general guide, smaller kitchen and bathroom remodels fall in the two-to-six-week range for on-site work.
A kitchen that keeps its existing layout, new cabinetry, countertops, backsplash, and fixtures, moves faster because it avoids relocating plumbing, electrical, and walls. A full redesign that reconfigures the layout, adds an island, moves the sink or range, or opens the kitchen to adjacent rooms takes longer, because it involves structural, plumbing, and electrical work along with the finishes.
Remember that on-site time is not the whole story. Before construction, there is a design phase, where we plan the layout and create 3D renderings, and material lead times to plan around. Custom cabinetry and stone countertops in particular are ordered weeks in advance, and it is often smart to have key materials on hand before demolition begins so the project runs without gaps. We sequence all of this so your kitchen is out of commission for as little time as possible.
Because the kitchen is such a central room, we know being without it is a real disruption, so we plan carefully to keep the timeline tight and predictable. We provide a detailed schedule before we begin and keep you updated throughout, and you can read about living in your home during the remodel and what is involved in a kitchen remodel.
For a timeline specific to your kitchen, which depends on your layout, scope, and material choices, a consultation is the best step. You can see finished kitchens in our portfolio. To get started, contact us at (425) 405-0147 or request an estimate.